The tower formerly called 1 Undershaft was introduced as One London in June 2026. Its planned offices and public amenities create important FM interface questions.
This article began as coverage of the 1 Undershaft proposals in 2024. The City of London Corporation approved revised proposals on 13 December 2024, including office space, public amenities and an education/viewing-gallery offer.
June 2026 update: One London
In a 1 June 2026 announcement, Aroland, Stanhope and Eric Parry Architects introduced the scheme as One London. They stated that construction was scheduled to begin in 2028 and practical completion was targeted for 2033. These are the announcement’s future timings, not a completion statement or an independently verified programme.
Public access is part of the proposal
The project descriptions include an elevated public garden and a viewing and education offer associated with London Museum. Those intended amenities need to be read as part of the scheme and its delivery arrangements, rather than as facilities visitors can necessarily use today.
Why the interfaces matter to FM
An office-led tower with public destinations has several operating requirements to reconcile. Tenants, visitors, education groups, service partners and the public may use different spaces and routes. The operating brief needs to establish where those requirements meet and who can make the relevant decisions.
Questions for the future operating model
- How are tenant and public access, opening hours and visitor communication organised?
- Who owns cleaning, maintenance and service support for shared areas?
- How do technical, security and emergency arrangements interface?
- What information, testing and training will the FM team receive before handover?
- How will design or programme changes be reflected in the operating plan?
Treat design aims as aims
Public-realm, environmental and economic objectives are important context, but are not evidence of operational performance. Compare the confirmed specification, responsibilities and measured results when they become available, rather than relying on promotional rankings or an architectural quotation.
The architect’s project page provides further scheme context. It is not a substitute for the authoritative documents needed for a live technical or statutory decision.
FM planning implications
- Recognise both the former name and the June 2026 update.
- Keep future programme dates and public amenities in their announced context.
- Plan the interfaces between commercial and public operations.
The operating-model question
The scheme is a useful example of the operating questions created by combining offices and public destinations. An FM brief should follow the confirmed design, responsibilities and handover evidence as the project develops.
Next steps
Related guidance: The Future Workplace & Facilities Management.
For an FM appointment, explore Maxwell Stephens’ specialist Facilities Management recruitment service.


