FM teams planning EV charging should assess demand, electrical capacity, accessibility, applicable requirements and the full cost of reliable operation.
Workplace EV charging is an electrical and service-planning project. Facilities Managers can coordinate the brief, but the design, installation and safety decisions need the appropriate competent specialists.
Define who needs to charge
Separate fleet vehicles, staff, visitors and tenants. Record typical arrival times, dwell times and the energy needed for the next journey or duty. Vehicle numbers alone do not tell you how much charging capacity a site needs.
- Agree the initial demand and plausible expansion scenarios.
- Decide how access, booking, overstaying and charging priority will work.
- Consider accessible bays, routes, controls and payment arrangements.
- Clarify responsibilities between owner, landlord, occupier and operator.
Check the supply and site design
Ask the designer and electricity network operator to assess available capacity, connection work and future expansion. Compare charger types and load-management options against the use case. Include civil works, drainage, lighting, cable routes, protective measures and maintenance access in the budget.
Assess charging locations, battery-related risks and emergency arrangements with appropriate electrical and fire-safety advisers. Keep pedestrian and vehicle routes usable. A charger should not be selected solely by its headline power rating.
Establish the applicable requirements
Approved Document S provides guidance for Part S of the Building Regulations in England, covering specified new buildings, major renovations and other defined work. It does not impose the same retrofit requirement on every existing workplace car park. Check the project scope, jurisdiction, exceptions and other relevant requirements before specifying work.
Grant availability and conditions can change. Check an official scheme’s current eligibility before including funding in a business case; do not treat an assumed grant as committed income.
Budget for operation as well as installation
- Connection, equipment, installation and any required supply upgrade.
- Software, connectivity, payments and operator charges.
- Inspection, maintenance, faults and customer support.
- Energy procurement and the method of allocating cost.
- Support life, data security and the ability to change provider.
Integrate energy options carefully
Load management, solar generation and storage may help a particular site. Model their timing, cost and operating limits together. Vehicle-to-grid needs compatible vehicles, chargers and arrangements; it is not a feature that every installation can use.
Accept the service into operation
Collect design and commissioning records, assign an operating owner and train the people who will support users. Check the booking or payment journey, fault reporting and recovery arrangements. Review actual use before committing to the next phase.
Frequently asked questions
Does every existing UK workplace have to install EV chargers?
No universal requirement should be assumed. Building, planning and other duties depend on jurisdiction and project scope. England’s Part S requirements concern specified building work; check the current rules and any exceptions for the actual project.
What should an FM EV-charging business case include?
Include demand, available electrical capacity, installation and connection work, accessibility, safety, software, energy, maintenance and support. Compare options over their operating life and keep possible grants separate from confirmed funding.
Key takeaways
- Design around vehicle use and electrical capacity.
- Check jurisdiction and project scope before stating a legal duty.
- Assign maintenance, support and expansion decisions.
Conclusion
A useful charging service matches the estate’s demand and capacity, remains accessible and has an operating plan. Technical design and reliable support matter as much as installing the equipment.
Next steps
For more detail, read Smart Buildings and the Future of FM Operations.
Maxwell Stephens specialises in Facilities Management recruitment. Discuss the capability your team needs through our Technical FM recruitment service.


